LiteLogDocs
English

Tasks in the App

{/* The dedicated tasks tutorial (app-05) was merged into the basics episode on 2026-07-28 — it now covers the task list as well. */}

In the LiteLog app, your employees view and complete tasks on the go — including checklist, photo proof, and offline mode. Tasks are created in the web portal's Tasks & Rounds workspace or directly in the app; they are analyzed in the portal.

Features at a Glance

Creating a Task in the App

The Task quick action on the dashboard opens the "New task" form with the active property preselected (Create tasks permission). The app always saves a new task on the device first and then uploads it to the server, online as well as offline. Until the upload, the task carries the Waiting for upload badge in the dashboard's task feed, and the detail view shows a note that the task is saved on the device. You can complete the task right away; editing and status changes are only possible after the upload. The task appears in the task list and in the calendar only once it has been uploaded.

If the server permanently rejects the task, the app shows Upload failed with the reason. Use Discard task in the detail view to remove the task from the device.

Location on the Floor Plan

If the property has floor plans — uploaded in the portal or from the app —, the "New task" form shows the row On the floor plan below Checkpoint. Without a floor plan on the property the row is not shown; if the pin picker opens without an available floor plan, it offers Scan floor plan with the permission "Create control points".

  1. Tap On the floor plan. If the property has several floor plans, the app first asks Which floor?; with exactly one floor plan this step is skipped.
  2. On the plan, a long press places the pin and dragging moves it. Pinch with two fingers to zoom; a double tap zooms in and out. The other open tasks and the checkpoints of the floor are shown semi-transparent.
  3. Optionally enter a note about the spot (up to 300 characters), e.g. "lock is stuck".
  4. Apply returns to the form. The row now shows the floor and the note; the X (Remove floor plan marker) deletes the pin again.

If you change the property in the form, the app removes a pin that is already placed, because its floor plan belongs to the previous property. The pin is saved together with the task. In the app you only place it when creating the task; afterwards it can be changed or removed in the detail view in the portal.

The detail view of a task with a pin shows the chip Floor plan: Ground floor and the section Location on the floor plan with a preview of the floor, the pin and the note. Tapping the preview ("Tap to enlarge") opens the plan in full screen with zoom:

  • The floor chips switch to the property's other floor plans.
  • The toggle All open tasks on this floor shows the pins of the other open tasks, with a count ("3 open").
  • The toggle Control points on this floor shows the checkpoints pinned there; a tap on a point shows its name, area and instruction.
  • Tapping another task's pin opens that task.

If no image is available, for example without a connection, the section shows the text "Floor plan: Ground floor · note" instead.

Viewing Tasks

The task feed right on the dashboard shows all open tasks of the properties you have access to — together with the planned rounds. These are not only the tasks assigned to you: the assignee is a hint, not a lock. In addition, you see the open tasks of the currently selected property in its property view. Overdue tasks are marked accordingly.

Opening the Detail View

Tapping a task opens the detail view with title, description, due date, priority, assignment, and attachments — the same information as in the detail view in the portal.

Changing the Status

Use the status field to set a status such as In progress or a custom phase of your account (Edit tasks permission). Changing the status does not replace completing: only the complete button creates the proof with photo, form, or scan.

Checking Off the Checklist

If the task contains a checklist, you check off the individual items directly in the app; online, every tick is saved immediately and shows in the portal as well. Items with a camera require a photo per item (“Take photo” below the item, live camera only); the photo ticks the item off and travels with the completion. If an item does not apply, tap Not applicable on the item and enter a reason (mandatory); the item then shows “n/a: reason” and counts as fulfilled. If the checklist carries the badge Required, completing is only possible once every item is ticked or marked as not applicable and every item with a camera has its photo — the locked button names the open item (“Checklist incomplete: …”). Without the badge items may stay open: completing is possible right away, without any prompt; open items and missing photos are noted by the app in a grey line (“1 item open, 1 photo missing”), and that is how they appear in the report. You set the switch All items are required when creating or editing the task in the app, below the checklist; a loaded template brings its default along.

Completing with a Photo

Use the complete button to finish the task. If photo proof is required for the task, the photo capture opens when completing — the photo is taken live with the camera; choosing from the gallery is not possible. Without a photo, the task cannot be completed. If all items are required and the checklist has items with a camera, the task's photo proof is waived: the photos per item are the proof, and the app does not ask for another photo on completion. The photo is stored with the task and is visible in the portal.

Completing with a Form

If a form template is bound to the task, "Fill out form" appears instead of the complete button. Submitting the form completes the task. If the template is deactivated in the portal, the app only shows the note "Form inactive" — the task then cannot be completed in the app until the template is active again or the binding has been removed in the portal.

Complete Only at Checkpoint

If "Complete only at checkpoint" is enabled for the task, the app locks completion until you have scanned a linked checkpoint. Scan the checkpoint and complete the task from the "Due at this point" overview.

Reporting as Not Feasible

If a due task cannot be completed — for example because the room is occupied or the key is missing — tap Not feasible next to "Mark as done" in the task. The button is available wherever you complete a task: in "My tasks", under "Due today", in the overview after scanning a checkpoint, and in the task list at a route stop. A sheet asks for the reason from a fixed list: Access denied, Material missing, Area occupied, Safety risk, Equipment defective, or Other — for "Other" an explanation is mandatory. You can attach a photo. If the digital signature applies to tasks at the property, the app requests it just as when completing. If "Complete only at checkpoint" is set, reporting is also only possible after the scan.

Afterwards the task shows the status Not feasible (amber) and a banner with the reason in the detail view. The task counts neither as done nor as overdue. At a route stop, the task list counts "x of y done · n not feasible". In the portal, the property manager reviews the report and acknowledges or dismisses it — after dismissal, the task is open again. If the occurrence is completed later after all, LiteLog dismisses the report automatically. See Task Detail View (Portal).

Material on Completion

If the Material feature is active, the task is assigned to a property, and you have the Create material permission, the material step appears when completing: the "Expected material" stored on the task is prefilled with the expected quantity, and you confirm or correct the quantities. The direction set per item in the portal determines the booking: with Withdrawal the step is called "Material consumed" and the quantity is deducted from the property stock, with Refill it is called "Material refilled" and the quantity is added; if the task contains both directions, each row shows its direction. Only rows with a quantity greater than zero are booked.

Already Completed Entries

An occurrence of a series can be completed only once. If you open it again afterwards — for example from the history — the detail view shows the banner "Completed today — proof recorded." or "Completed on … — proof recorded." without a complete button; checklist and details are then read-only. One-off tasks move to the Done phase on completion and disappear from the task feed.

Completing Offline

Tasks can be created, checked off, completed, and reported as not feasible without an internet connection. Changes are stored locally in the queue and synchronized automatically as soon as a connection is available again.

The location on the floor plan can also be set offline: it travels with the new task in the queue. The app keeps a property's floor plans for up to 24 hours and, without a connection, also falls back to an older list so that it knows whether the property has floor plans. It only shows the image itself offline if it was loaded with a connection before; otherwise "The floor plan image is currently unavailable." appears.

Offline availability

Offline, the task list is only available for the most recently used properties. Open a property once while connected so that its tasks are also available offline. Only open tasks with a due date within the synchronization period are kept offline. Tasks without a due date do not appear offline — not even when scanning a linked checkpoint. Therefore, give tasks that are to be completed offline a due date.

Good to Know

Note

  • Tasks bound to a checkpoint appear when the checkpoint is scanned. In a planned round, such a task counts as completed with the scan, unless it requires photo or form proof — see Perform Route.
  • New tasks and changes from the portal appear in the app automatically after the next synchronization. Tasks created in the app, in turn, appear in the portal once the app has uploaded them.
  • My defaults (⋮ menu in the "New task" form): property, assignee, and due date that new tasks receive when there is no other context — the same defaults as the gear icon in the portal, mirrored on the device and therefore also effective offline.
  • If the same completion reaches the server twice — for example after an offline synchronization — it is merged into one proof; the app shows no error.

Permissions

Permission

To see tasks in the app, you need the View tasks permission; to create them, Create tasks; to complete them, to report them as not feasible, and to check off the checklist, the Complete tasks permission; to change the status, Edit tasks. Contact your administrator if you do not have access.