LiteLogDocs
English
LLMs.md

Create Task

The "Create" button opens the create sidebar ("New task") on top of the current view — the list behind it remains visible, so you never lose your context. For a quick task, the name is enough; everything else can be added via the detail fields.

Features Overview

Name

The only required field. Enter a meaningful title (e.g. "Replace fluorescent tube in underground garage").

The name field is also the entry point for using an existing task as a template:

  • Use as template — from two typed characters onward, matching existing tasks appear below the field, each with its property, last use, and a marker if the task runs as a series. They are ordered by name similarity, same property, recency, and frequency. One click copies the task completely into the form: checklist, proof requirements, recurrence, assignees, and categories.
  • Recently used — if the field is empty, focusing it shows the last five tasks you applied as a template on this device.

If you have already entered something yourself before applying a template, the form asks "Overwrite entries?". With pure prefills (see Prefilled fields) this prompt does not appear.

After "Copy from task", the form checks the copied values against the due date:

  • If copied assignees are absent on the due date, a note appears under Assignee.
  • If the source already runs as a series, a note points out that saving creates a second series.

Add Details

Below the name sits the "Add details" row. Clicking an entry reveals the corresponding section; "Remove" takes it out again:

Detail Content
Description Free text with details about the task
Checklist Items that are ticked off when completing (up to 50). Per item: a grip for sorting, click the text to rename, a camera for a photo per item (“Require photo”), ×. Under “+ New item” you can paste several lines at once; a typed item is kept even without Enter as soon as you leave the field or create the task. The Template menu loads the items of a saved checklist as a copy or saves the current list as a template; a loaded template brings its default for the switch along. The switch All items are required decides what the list means on completion. On: the task can only be completed once every item is ticked and every item with a camera has its photo. If an item does not apply, the person marks it as Not applicable and gives a reason (mandatory); the item then counts as fulfilled, and the reason appears in the log, in the proof PDF and in the completions export. Off: items may stay open and there is no prompt on completion; open items and missing photos are noted silently (“1 item open, 1 photo missing”) and appear in the proof PDF as “open” or “photo missing”. The camera on an item blocks completion only when all items are required. Switch and items are available in the portal and in the app
Photo proof Enable mandatory photo proof on completion and upload reference photos/attachments. If all items are required and the checklist has items with a camera, the task's photo proof is waived: the chip is greyed out (“Waived: the checklist has photo items”), the setting stays saved and applies again once the switch is off or no photo item is left in the list
Fill out form Binds a form template: the task is completed by submitting the form (only shown when active templates exist)
Expected material Material defaults for the task: quantity and direction per item — Withdrawal (consumption from the property stock on completion, e.g. consumables at a motorway service area per cleaning round) or Refill (resupply to the property). Can be entered while creating and are applied on save (Material feature and Edit material permission required)
Checkpoint round Switches to the property's route wizard if a round with checkpoints should be created instead of a task

Properties

The right-hand column carries the Properties panel in this order: property, checkpoints (link, see below), floor plan (location on the floor plan, see below), assignee, due date, recurrence, priority, categories, and reaction; once the task is saved, the status is added at the top. The property comes first because it determines the checkpoints, the floor plans, the available reaction rules, the assignee suggestions, and the non-working days of a series. Everything can be filled in before saving — so you create the task completely in one go. Without your own choice, the priority is "Medium"; the reaction follows the reaction defaults of the property and the tenant. If no rule applies there, a yellow warning icon next to the reaction shows that nobody is notified when the task becomes overdue; clicking it opens the effective chain. A due date in the past is allowed, and the label then carries an info icon: the task is overdue immediately. Categories are limited to 20 per task and 50 characters; capitalisation does not distinguish categories ("Sanitary" and "sanitary" are the same). After saving, the comment section appears below.

For Assignee and Categories, the whole row is clickable: a click anywhere in the row opens the selection, not only the "+ assign" or "+ category" entry.

Several assignees, one completion: If a task is assigned to several employees, such as a crew or a squad, not everyone has to complete it individually. One employee completes the task on behalf of all, and it then counts as completed for the whole crew. The completion and the history show who completed it and when. There are no fixed crews as a reusable group: you pick the employees involved per task under Assignee. What is stored is the time of completion; a start time is not recorded on the task, the working time is visible through the shift's time tracking.

The assignee is a hint for the team, not a lock: in the app, all employees with access to the property see the open tasks and may complete them with the Complete tasks permission. Tasks without a due date only appear in the list within the selected date range (default: last 7 days from the creation date) — assign a due date if the task should stay visible permanently. As long as neither a due date nor a recurrence is set, the Date label carries a small info icon; its tooltip reminds you that without a due date or recurrence the task does not appear in the schedule. Once either is set, the icon disappears.

Prefilled fields

Fields the form has filled in itself carry the marker "prefilled"; the tooltip names the origin:

  • From context — you opened the form from the property page, from a day in the schedule, or from a checkpoint; property, due date, or checkpoints are set accordingly.
  • Automatic — the tenant has only one property; it is already selected.
  • From your defaults — the value comes from your personal default values (see My defaults).
  • Suggestion — the value comes from the history, the property's responsible persons, or the roster (see below).

Your own entries are never overwritten by prefills. If you change the property filter in the schedule while the form is open, typed values stay in place.

If several sources apply to the same field, this order of precedence applies: context (property page, schedule day, checkpoint) before your own entry, before "Copy from task", before My defaults, before suggestion, before the automatic choice of the only property.

Suggestions for assignees and categories

As soon as the property or the due date is set, the system suggests assignees and categories. Candidates for assignees are the property's responsible persons who are scheduled in the roster on the due date; anyone absent on that day is left out, without stating the reason. Confident suggestions are entered directly by the form (marker "prefilled"); uncertain ones appear as a link "Apply suggestion: …" below the respective row and are applied only when clicked.

My defaults

To the right of the Properties heading sits a gear icon — only when creating, not in the detail view. It opens My defaults: personal default values that apply only to your account and only when creating new tasks. You define:

  • Property — the property that new tasks receive when there is no other context.
  • Assignees — the employees entered by default.
  • Due — empty, today, tomorrow, or in one week, each relative to the day of creation.
  • Categories — the task categories set by default.

Save applies the defaults to the open form immediately, but fills only fields that are still empty; everything else takes effect the next time you open the form. Reset removes all personal defaults again. Fields that come from the defaults carry the "prefilled" marker with the origin "from your defaults".

In the app: The same defaults apply when creating in the LiteLog app — via the ⋮ menu at the top right of the "New task" form → My defaults. The app edits property, one assignee, and the due date; additional assignees and categories from the portal are kept. The defaults are mirrored on the device and also apply offline. A task created in the app is saved on the device first and appears in the portal once the app has uploaded it.

My defaults do not replace the tenant defaults: reaction, categories, and status are still maintained under Settings — the dialog links there (reaction defaults, task categories, task phases).

Linking checkpoints and "Complete only at checkpoint"

Under Checkpoints you select one or more checkpoints of the chosen property. A task can be bound to several checkpoints, and a checkpoint can carry several tasks. Checkpoints always belong to the task's property: if you change the property, the portal asks for confirmation and detaches the checkpoints of the previous property; a reaction that applied to the previous property only falls back to the default. The employee sees the task in the app after scanning the checkpoint — a task with a time of day only from two hours before that time, overdue tasks always; in a planned round it counts as completed with the scan, unless photo or form proof is required. The task can still be completed without a scan — in the portal as well as in the app.

If completion must take place on site, enable "Complete only at checkpoint" (shown as At checkpoint only in the properties panel, the full term sits in the info icon): the app then allows completion only after scanning a linked checkpoint. In the portal, completion remains possible, but it is saved with the note "completed without scan". Without linked checkpoints, the switch has no effect.

Location on the floor plan

If the chosen property has floor plans, you mark where the task is to be done in the Floor plan row directly below the checkpoints. Without a property the row says "Choose an object first", without a floor plan on the property it shows the grey hint "No floor plan available" (users who may add floor plans also see the link "Manage floor plans").

  1. Click + On the floor plan. The window Mark on the floor plan opens.
  2. Choose the plan under Floor. Semi-transparent pins show the other open tasks on this floor.
  3. Click the spot on the plan to place the pin. Dragging moves the plan, the mouse wheel or a double-click zooms. Another click moves the pin.
  4. Optionally enter a Note (up to 300 characters), e.g. "Lock on the second door to the left is broken".
  5. Apply closes the window. The row now shows the chip "Ground floor · note…" with a pencil (Change pin) and an X (Remove pin).

The pin is saved together with the task when you click Create task. If saving the pin fails in an exceptional case, the task is still created; the notice "Not everything was saved." then lists "Location on the floor plan", and Try again saves the pin afterwards. Each task has at most one pin.

The pin belongs to the property: if you change the property while creating the task, the form discards a pin you have already placed, because its floor plan belongs to the previous property. On a saved task, a pin blocks the property change, see Task Detail View.

Series (Recurring Tasks)

Under Recurrence you set a recurrence rule — this creates a series. The series remains one task in the list; each date is completed individually, and the Done (30d) column shows how many of the recent dates were completed. A skipped date remains visible as a gap in this rate, and the next date still comes.

Start, time and end

The start and the time of the series are set in the properties, not in the dialog. As soon as a recurrence is set, the Date field is labelled Starts on instead: it holds the first day of the series. The Time applies to every date of the series. When creating a task, you cannot choose a start in the past.

Next to the time, + End lets you set an end time, for example 17:00 to 21:00. Until then today's occurrence counts as open and only afterwards as overdue — in the list, on the dashboard and in the app. Without an end time an occurrence turns red from its start time, as before. The end must be after the time; removing the time removes the end as well. Lists and the schedule show the span as "17:00–21:00".

The same end is available for a one-off task without recurrence: a task "Clean windows", due on 13 Oct from 12:00 to 14:00, counts as open ("due by") until 14:00 and only turns red afterwards. Without an end it becomes overdue from its time, as before. You set the end next to the time, in the form as well as in the schedule's quick create; moving the time past the end removes the end.

If the chosen start does not match the rule — for example, Starts on is a Tuesday but the series only runs on Wednesdays — Starts on jumps to the first matching day when you click Done.

Rhythm

Clicking the Recurrence row opens the dialog:

  • How often? — Daily, Mon–Fri, Sat–Sun, Weekly, Every 2 weeks, Monthly, Quarterly, Every 6 months or Yearly. With Repeat every you stretch the interval, e.g. every 2 months. Quarterly and Every 6 months are monthly rhythms with an interval of 3 and 6; Yearly counts in years.
  • On which days? — for weekly rhythms, the weekdays as selection chips.
  • On which day of the month? — for monthly rhythms, the day of the month from a grid.

The weekday or day of the month of Starts on is preselected.

The dialog asks nothing more at first: for Mon–Fri, Sat–Sun or Daily, the How often? row is all there is. The same applies to the entries of the Popular group (e.g. Once a week, Mon–Fri): they carry days and leeway in their name, so neither the day selection nor a summary appears below them. Repeat every, the question When must the task be done?, the holiday rule and Ends sit under More settings. The section stays collapsed while everything is at its default and opens by itself as soon as a setting deviates; collapsed, it names the deviation in its header, e.g. "± 2 days · Ends 31.12.2026".

When must the task be done?

Under More settings you answer one question with four answers. Each answer shows an example line based on your settings:

Answer Meaning Example
Exactly on the planned day (default) Only the date itself counts as on time. e.g. due on Wed 23.09 → must be done on Wed 23.09
With leeway The date may be completed up to n days before or after. Not offered for a daily rhythm or "every 2 days", because no day of leeway fits there without overlap. e.g. due on Wed 23.09 → complete between Mon 21.09 and Fri 25.09 (with 2 days)
Any time in the month A completion on any day in the calendar month of the date is enough. Only for monthly rhythms such as Monthly, Quarterly or Every 6 months. e.g. due on Wed 23.09 → complete between Tue 01.09 and Wed 30.09
Always … after the last completion The next date counts from the actual completion; "…" stands for your interval, e.g. "Always 1 week after the last completion". e.g. due on Wed 23.09, done on Fri 25.09 → next due on Fri 02.10 (weekly)

With leeway, the periods of two dates never overlap; the maximum number of days depends on the rhythm — weekly, for example, at most 3 days. A daily rhythm has no leeway; the answer With leeway is then not offered, only from "every 3 days" on. A date only becomes overdue after the last day of its period. A recurring task with leeway (± days) or a monthly period appears under Today and This Week on every day of its period until it is completed or reported as not feasible.

The answer after the last completion fits wherever the gap since the last execution matters rather than the calendar date — deep cleaning, filter changes, maintenance. Weekdays and days off do not apply here.

One open date at a time

With after the last completion only the next date is ever open — the series continues only once the work has actually been done. If a task is left undone, no follow-up date is created, and the overdue notification is sent once instead of on every missed day.

Below the selected answer, its settings follow:

  • up to … days before or after — the leeway in days (only with "With leeway").
  • On holidays and non-working days — what happens on public holidays and non-working days (not with "after the last completion"):
    • Treat normally — the date stays where it is.
    • Skip on holidays — there is no date on public holidays.
    • Only on holidays — the series runs on public holidays only.
    • Move to the working day before — the date moves to the previous working day. If that day lies in the previous month, it moves to the next working day instead.
    • Move to the working day after — the date moves to the next working day.
  • Ends — Never, On date (the series runs until a fixed end date) or After X occurrences (the series ends after a set number of dates; not with "after the last completion").

If several moved dates land on the same working day, a single date is created there. Non-working days follow the property; tasks without a property are calculated with Monday to Friday and without public holidays. Schedule, task list and completion rate all show the moved day.

Schedule preview

When the dialog opens, the Schedule preview is hidden. The Schedule preview button in the dialog header shows it to the right of the settings and hides it again; the dialog remembers your choice. Once shown, it is the planning matrix of all properties (the same view as the task plan) for one week or one day. The selected property is pinned and highlighted in blue in the first row; the other properties follow below with their appointments — patrols, tasks, tours, shifts. Between the existing appointments, the new occurrences of this task appear as dashed cards with the chip New. Planned only is switched on, so properties without appointments in the period are hidden; a click on the checkbox shows all of them. Below the matrix, the legend explains layers and symbols as in the task plan. This way you see before saving where the task lands in the plan and whether it coincides with other appointments. Use the arrows to move through periods, Today jumps back, Go to first occurrence opens the week of the first occurrence. Without a property the new occurrences appear in the No object row. The cards are display only; nothing can be changed in the preview.

When editing an existing series, its own occurrences are hidden — you only see the new state.

Apply or discard

Done applies the settings to the task. Cancel, the Esc key or a click outside the dialog discards them; the task then stays unchanged.

The dialog reports invalid settings directly at the affected field, and Done stays disabled until they are fixed:

  • the end lies before the start,
  • a weekly rhythm without a weekday,
  • a leeway too large for the chosen rhythm,
  • when creating, a start in the past.

Change approval

If task schedules require approval in your account, the dialog shows a Reason for change field — both when creating and when editing. The reason needs at least 5 characters. The recurrence is submitted as a request and only takes effect once a second person has approved it.

Pausing, ending or removing a series

On a saved series, the Recurrence row offers the action Pause series. While the series is paused, no new dates are created and the row shows the suffix · paused; Resume series picks it up again. With change approval, pausing also only takes effect after approval.

With Ends set to "Never", the series keeps running until you end it or remove the recurrence. You do both in the dialog of the Recurrence row: set an end under More settings, or click Remove recurrence at the bottom left. Changes always apply to the whole series — there is no "this date only".

Tasks bound to checkpoints

Tasks bound to checkpoints have no series schedule of their own: they are completed per round run in which the checkpoint is scanned; without a running route, the day of the scan counts. A custom recurrence rule and the checkpoint binding are mutually exclusive. Details: Manage Checkpoints.

Digital signature

If the selected property requires a digital signature for tasks under Tamper protection (Required), the form automatically shows the Digital signature section with the note "From object: required". The task inherits the requirement from the property; the selection stays on Inherit from object, no override is needed. On completion, the executing person then confirms their identity — in the portal by password, in the LiteLog app by password, NFC chip, or QR code. What the signature provides and how the cascade of feature, company switch, property, and task works together is described under Digital Signature.

Saving

"Create task" saves the task and it immediately appears in the list. The creation is automatically recorded in the task's change history.

Good to Know

Note

  • You set priority and reaction after saving, in the detail view. Without your own choice, the priority is "Medium" — for tasks from the portal as well as for tickets from the customer portal.
  • If you open the sidebar from a property's Tasks tab, the property is already prefilled (origin "from context").
  • The "Recently used" list in the name field applies to this device only; on another device it starts empty.
  • My defaults, by contrast, apply to your account on all devices — but only when creating; context and your own entries always take precedence.

Permissions

Permission

To create tasks, you need the Create tasks permission. Contact your administrator if you do not have access.